After the job
Aftercare
Every system handed over: last month’s output against its estimate, service due and warranty left. Faults come to the top.
Needs a visit
G. Quigley: string 1 offline, inverter fault code F13.
5.6kWp + EV. Output last month was 61% of its estimate. Warranty left: 9y 4m. An aftercare job is raised.
Systems
5
Handed over and looked after
Healthy
3
No fault, output on track
Need a look
2
1 fault, 1 low output
Service overdue
1
Yearly check missed