Sample data. Not connected to your Xero.
Yours
Automations
Rules that do the routine bits on their own: a draft PO when stock runs low, no install booked before NIE Networks approves, a chaser when a deposit is late. Turn one off and that job goes back to a person.
See three of these run on one job
Follow J-1058 from enquiry to paid. When the deposit is paid, the van is loaded and the install is finished, a rule does the next bit and its line shows below.
Follow one jobThe rules
7 of 8 on| Rule | Area | Status |
|---|
Low stock: draft a PO When a line in the warehouse hits its reorder level. Then draft a purchase order to its supplier, for the office to check and send. | Stock | On |
Van top-up When a line on a van drops below its minimum after a job. Then add it to the next warehouse to van list. | Stock | Off |
No install before NIE Networks approves When someone books an install NIE Networks has not approved. Then stop the booking and put it on Today. | Paperwork | On |
Sign off reminder When an install is finished. Then remind the installer: tests, certificates and the handover pack. | Paperwork | On |
Deposit chaser When a quote is accepted and the deposit is unpaid after 3 days. Then email and text the customer. | Sales | On |
Deposit invoice to Xero When a quote is accepted. Then send the deposit invoice to Xero. | Money | On |
Low output When a system makes under 85% of its estimate in a month. Then raise an aftercare job and tell the owner. | Aftercare | On |
Review request When 3 days after the handover. Then ask the customer for a Google review. | Aftercare | On |
What they did lately
| When | What happened |
|---|
| Today | J-1058 Ciara Mullan: install finished. Liam reminded: tests, certificates, handover pack. Sign off reminder |
| Today | J-1058 kit loaded onto Liam’s van. 440W panels now low in the warehouse: a PO to Segen is suggested. Low stock: draft a PO |
| Today | J-1058 Ciara Mullan: quote accepted. Deposit invoice INV-3106 sent to Xero. Deposit invoice to Xero |
| Today | Hybrid inverter 5.0kW low in the warehouse: PO-2251 to Segen drafted. Low stock: draft a PO |
| Today | J-1051 Omagh GAA: install booking stopped. NIE Networks has not approved it yet. No install before NIE Networks approves |
| Today | G. Quigley: 61% of estimate, inverter fault F13. Aftercare job raised. Low output |
| Mon 9 Nov | T. Bonner: 82% of estimate, possible soiling. Aftercare job raised. Low output |